Here you can find a collection of drawings of tram networks from Arad. They're drawn based on the aerial and satellite imagery present in the Wikimapia site.

Click here to return to the main page with the current situation from all cities.


Current situation
TRAMS (WHOLE NETWORK)

Current situation.

Active network: 53.8 km equivalent (27.8 km double track, 24.2 km single track used two-ways, 3.5 km single track).
Inactive network: 0.3 km double track.
Total network: 54.1 km equivalent (28.1 km double track, 24.2 km single track used two-ways, 3.5 km single track).
Routes: 1(6.1 km), 1b(10.3 km), 2(10.0 km), 3(9.7 km), 4b(7.8 km), 5(9.4 km), 6(7.6 km), 7(7.5 km), 8(5.5 km), 9(14.1 km), 10(12.1 km), 11(26.9 km), 12(24.9 km), 14(14.6 km), 15(6.4 km), 15b(9.5 km), 16(4.9 km), 16b(15.7 km), 17(7.5 km), 18(5.5 km).
The longest routes are indicated in green while the shortest ones are in red.


2008
TRAMS (WHOLE NETWORK)

Situatia din 2008, dinaintea aparitiei liniilor maxi-taxi, conform hartii oficiale CTP Arad. Fata de 2003, reteaua se extinde catre Platforma Vest.

Active network: 53.8 km equivalent (27.8 km double track, 24.2 km single track used two-ways, 3.5 km single track).
Inactive network: 0.3 km double track.
Total network: 54.1 km equivalent (28.1 km double track, 24.2 km single track used two-ways, 3.5 km single track).
Routes: 1(6.1 km), 1b(10.3 km), 2(10.0 km), 3(9.7 km), 4b(7.8 km), 5(9.4 km), 6(7.6 km), 7(7.5 km), 8(5.5 km), 9(14.1 km), 10(12.1 km), 11(26.9 km), 12(24.9 km), 13(11.4 km), 14(14.6 km), 15(6.4 km), 15b(9.5 km), 16(4.9 km), 16b(15.7 km), 17(7.5 km), 18(5.5 km), CET(9.4 km).


2003
TRAMS (WHOLE NETWORK)

Situatia din octombrie 2003 conform Strassenbahnatlas Rumanien 2004. Fata de 1993, se extinde reteaua pe str. Voinicilor.

Active network: 50.0 km equivalent (27.8 km double track, 20.4 km single track used two-ways, 3.5 km single track).
Inactive network: 0.3 km double track.
Total network: 50.3 km equivalent (28.1 km double track, 20.4 km single track used two-ways, 3.5 km single track).
Routes: 1(6.1 km), 2(10.0 km), 3(9.7 km), 4b(7.8 km), 5(9.4 km), 6(7.6 km), 7(7.5 km), 8(5.5 km), 9(14.1 km), 10(12.1 km), 11(26.9 km), 12(24.9 km), 13(13.3 km), 14(14.6 km), 15(6.4 km), 15b(9.5 km), 16(4.9 km), 16b(15.7 km), 17(7.5 km), 18(5.5 km), 22(3.5 km), CET(9.4 km).


1993
TRAMS (WHOLE NETWORK)

Situatia din 1993.

Active network: 49.8 km equivalent (27.6 km double track, 20.4 km single track used two-ways, 3.5 km single track).
Routes: 1(6.1 km), 2(10.0 km), 3(9.7 km), 3b(3.6 km), 4(12.9 km), 4b(7.8 km), 5(9.7 km), 7(8.1 km), 8(5.8 km), 9(14.1 km), 10(12.1 km), 11(26.9 km), 12(24.9 km), 13(9.5 km), 14(14.6 km), 15(6.4 km), 15b(9.5 km), 16(4.9 km), 16b(7.9 km), 17(6.8 km), 18(4.8 km).


1988
TRAMS (WHOLE NETWORK)

Situatia din 1988.

Active network: 49.8 km equivalent (27.6 km double track, 20.4 km single track used two-ways, 3.5 km single track).
Routes: 1(6.1 km), 2(10.0 km), 3(9.7 km), 4(5.8 km), 5(9.7 km), 7(8.1 km), 8(5.8 km), 9(14.1 km), 10(12.1 km), 11(26.9 km), 12(24.9 km), 13(9.5 km), 14(14.6 km), 15(6.4 km), 15b(9.5 km), 16(4.9 km), 16b(7.9 km), 17(6.8 km), 18(4.8 km).