Romana

English

Here you can find a collection of drawings of tram networks from Iasi. They're drawn based on the aerial and satellite imagery present in the Wikimapia site.

Click here to return to the main page with the current situation from all cities.


Current situation
TRAMS

Current situation.

Active network: 29.7 km equivalent (29.4 km double track, 0.4 km double track used one-way).
Inactive network: 5.2 km double track.
Total network: 35.0 km double track.
Routes: 1(8.0 km), 2(6.8 km), 3(7.5 km), 5(8.8 km), 6(6.2 km), 7(7.3 km), 11(10.5 km), 13(8.0 km).
The longest routes are indicated in green while the shortest ones are in red.


2009
TRAMS

A historic minimum for the Iasi tram network - only 43% of the network (by length) in service and only two lines, during the summer of 2009.

Active network: 15.2 km double track.
Inactive network: 19.7 km double track.
Total network: 35.0 km double track.
Routes: 3(7.7 km), 5(8.8 km), 5b(6.2 km).


2008
TRAMS

The situation during December 2008.

Active network: 26.3 km double track.
Inactive network: 8.7 km double track.
Total network: 35.0 km double track.
Routes: 1(8.0 km), 2(5.7 km), 3(8.3 km), 5(8.8 km), 6(5.6 km), 11(10.5 km), 13(8.0 km).


2006
TRAMS

Situation during summer 2006, before the start of track upgrade work.

Active network: 31.4 km double track.
Inactive network: 3.5 km double track.
Total network: 35.0 km double track.
Routes: 1(8.5 km), 2(7.1 km), 3(7.5 km), 5(8.8 km), 6(6.2 km), 7(7.0 km), 8(7.0 km), 11(10.5 km), 13(8.5 km).


1989
TRAMS

The maximum developement of the trams in Iasi - 1989.

Active network: 35.0 km double track.
Routes: 1(10.6 km), 1b(8.0 km), 2(10.2 km), 2b(7.6 km), 3(7.5 km), 4(8.0 km), 5(8.8 km), 5b(6.2 km), 6(9.1 km), 7(9.3 km), 8(8.0 km), 9(7.5 km), 9b(11.8 km), 10(8.0 km), 10b(7.7 km), 11(4.6 km), 12(4.7 km), 13(5.8 km), 14(8.3 km), 15(8.6 km).